Skip to content
EENISMODULAR HOUSE & PREFAB VILLA

Project type

Scalable modular building systems for resorts and multi-unit developments

Built on standardised 3.5m × 8.6m (30㎡) MIDI structural modules, developers can configure 1-bedroom eco-cabins (60㎡), 3-bedroom family suites (90㎡), or two-story 180㎡ resort villas with consistent E0-grade interiors, polyurethane roof waterproofing, and 2.0mm thermally broken aluminium sliding doors.

Modular structure assembly

MIDI module system

ItemSpecification
Module size3.5m × 8.6m = 30㎡ per structural module
Combinations60㎡ eco-cabin, 90㎡ family suite, 180㎡ two-storey villa
StructureLight steel frame with lightweight aggregate concrete or CFC infill
InteriorsE0-grade, consistent finish across every unit in the development
RoofPolyurethane insulation with waterproof membrane
Glazing2.0mm thermally broken aluminium sliding doors
ServicesPre-fitted bathroom and kitchen modules, ducted ready for connection
ProgrammePhased delivery matching the developer's sales and letting schedule

How a development is delivered

  1. 01

    Programme design

    Unit mix, module grid, services strategy and phasing agreed with your architect.

  2. 02

    Prototype

    One unit built, inspected and signed off before batch production.

  3. 03

    Batch production

    Modules produced to the approved prototype, numbered by building and level.

  4. 04

    Phased delivery

    Shipments sequenced to match your site programme and handover dates.

Modular production line

One module, many programmes

Because the structural module is constant, the developer keeps one set of drawings, one set of approvals and one installation method across every building in the scheme. Changing the unit mix at the design stage is cheap; changing it after production has started is not. That is why we insist on a signed prototype.

  • A single approved prototype governs every unit in the development
  • One installation method for all buildings, whichever configuration is sold
  • Factory dry-assembly check on every module before loading
  • Service connections designed as standard modules, not site improvisation

Planning a resort or apartment scheme?

Send the unit mix and the programme dates. We will build the delivery schedule around them.