EENISMODULAR HOUSE & PREFAB VILLA

Production

Steel structure, panel infill, one controlled line

The factory is arranged around a single flow: light steel frame fabrication, panel production, assembly bay, and final inspection. Because the same line produces every unit, a villa in Nairobi and a resort in Perth are built to the same tolerance.

Modular house factory production line

28 days

Standard production

4

Continents served

25 yrs

Structural warranty

100%

Dry-assembled before shipping

Production stages

Factory line
Frame fabrication
Production detail
Panel production
Assembly bay
Assembly bay
Final inspection
Final inspection
Module inspection

Quality control at each station

Frames are checked for squareness before panels close over them. Panels are checked for thickness and density against the batch record. Assembled modules are dry-assembled and function-tested for openings, glazing and services before they are crated. Nothing ships on the assumption that it will be fine.

  • Frame squareness and weld inspection before panel closure
  • Panel thickness, density and finish checked against the production record
  • Dry assembly and function test of every completed module
  • A photographed record travels with the shipment for the site file

Audits welcome

We will host you on the line and show you the QC records for your own order.